How Does a Line Stop Actuator Work: What You Need To Know

2023-09-06T12:47:19-04:00September 6th, 2023|Line Stop|

In the industrial world, pipelines are an integral component of various processes, often transporting vital fluids and materials where they need to go. For businesses relying on pipelines, it is crucial to understand the mechanisms that ensure uninterrupted flow and maintain system efficiency. However, there will be times when a pipe springs a leak [...]

3 04, 2023

5 Things To Know About Line Stopping Services

2023-10-24T11:33:01-04:00April 3rd, 2023|Line Stop|

Beneath our very feet is a web of pipelines that carry important resources such as energy and water to every home, business, and building around us. It’s thanks to these pipelines that we are able to have a constant and safe supply of resources that we can access at our leisure. However, the extent [...]

2 12, 2022

What’s the Difference: Line Stopping vs. Line Freezing

2022-12-02T15:10:33-05:00December 2nd, 2022|Line Stop|

Maintaining pipelines in service can get complicated – especially when their daily operations must not get interrupted. Luckily, a few different solutions allow those providing pipeline services to work on pipes while being as unobtrusive as possible. That begs the question, however, what’s the difference between line stopping and line freezing? Here's what you should [...]

14 04, 2020

Double 36″ Line Stop – Hilton Head

2020-06-10T09:33:48-04:00April 14th, 2020|Line Stop|

Here Rangeline performs a Double 36" Line Stop on ductile iron pipe.  These Line Stops were needed to install a new isolation valve at a water treatment facility while the system stayed up and operational.  The Line Stoppers held 100% allowing the maintenance crew to stay nice and dry while the new valve was [...]

20 09, 2019

Single 16″ Line Stop – Honolulu Hawaii

2020-02-08T20:09:09-05:00September 20th, 2019|Line Stop|

When it comes to Emergency Service Rangeline covers far and wide even Hawaii. Rangeline receives a call for a Emergency Single 16" Line Stop at the Honolulu Airport on a Friday afternoon.  Rangeline's Emergency Response Team jumps into action.  After loading and shipping the material and equipment Rangeline was on the jobsite Monday delivery [...]

19 09, 2019

Emergency Single 48″ Line Stop on PCCP – Mobile, Alabama

2020-02-23T17:37:20-05:00September 19th, 2019|Line Stop|

Here is a Emergency Single 48" Line Stop on Pre-Stressed Concrete Cylinder Pipe "PCCP" watermain in Mobile, Alabama. Once again Rangeline's Emergency Responds Team was called for a 48" PCCP watermain which failed.  Rangeline works closely with JCM Industries, Inc. to manufacture emergency Line Stop fittings for Concrete Pressure pipe.  This fitting was fabricated [...]

3 02, 2016

Triple Line Stop Emergency – City of Boca Raton, FL

2020-06-10T09:18:30-04:00February 3rd, 2016|Line Stop, Projects|

Recently Rangeline was called on a Emergency break for the City of Boca Raton, FL.  This is where Rangeline vast inventory of Line Stop fittings and experience really is brought to the test. Like any Emergency situation our customers is in a panic to stop the flow of raw sewage as quickly as possible. [...]

3 02, 2016

Line Stops on PCCP – Biloxi, MS

2020-06-10T09:14:08-04:00February 3rd, 2016|Line Stop, Projects|

Rangeline was call recently to perform a Double 20" Line Stop on pre-stressed concrete cylinder pipe "PCCP". These Line Stop were needed to replace a isolation valve in the City's system without interruption. Rangeline has over 20 years of experience Wet Tapping & Line Stopping PCCP pipe.  Rangeline's skilled technician's have countless hours of [...]

3 02, 2016

Double Line Stops – Biloxi, MS

2020-06-10T09:10:12-04:00February 3rd, 2016|Line Stop|

Recently Rangeline was called to relocated a pair of 14" PVC force mains.  First, Rangeline performed 14" By-Pas Wet Taps and the by-pass piping then was installed.  Then Rangeline installed four 14" Line Stoppers to isolate the 14" PVC piping. The Line Stoppers worked perfectly and the project was completed without a hitch.  When [...]

3 02, 2016

Quadruple 30″ Line Stops – Miami, FL

2020-06-10T09:15:35-04:00February 3rd, 2016|Line Stop|

You have heard the expression "That two is always better then one"?  Well then four is even better! Recently Rangeline was called to perform a Quadruple 30" Line Stops that's right four Line Stoppers all in the pipe at the same time. Rangeline had completed quadruple Line Stops before stopping smaller pipe but 30" [...]