Single 16″ Line Stop – Honolulu Hawaii

By |2019-09-20T10:58:04-04:00September 20th, 2019|Line Stop|0 Comments

When it comes to Emergency Service Rangeline covers far and wide even Hawaii. Rangeline receives a call for a Emergency Single 16" Line Stop at the Honolulu Airport on a Friday afternoon.  Rangeline's Emergency Response Team jumps into action.  After loading and shipping the material and equipment Rangeline was on the jobsite Monday delivery [...]

19 09, 2019

Emergency Single 48″ Line Stop on PCCP – Mobile, Alabama

By |2019-09-19T14:00:52-04:00September 19th, 2019|Line Stop|0 Comments

Here is a Emergency Single 48" Line Stop on Pre-Stressed Concrete Cylinder Pipe "PCCP" watermain in Mobile, Alabama. Once again Rangeline's Emergency Responds Team was called for a 48" PCCP watermain which failed.  Rangeline works closely with JCM Industries, Inc. to manufacture emergency Line Stop fittings for Concrete Pressure pipe.  This fitting was fabricated [...]

3 02, 2016

Triple Line Stop Emergency – City of Boca Raton, FL

By |2019-09-19T13:15:56-04:00February 3rd, 2016|Line Stop, Projects|Comments Off on Triple Line Stop Emergency – City of Boca Raton, FL

Recently Rangeline was called on a Emergency break for the City of Boca Raton, FL.  This is where Rangeline vast inventory of Line Stop fittings and experience really is brought to the test. Like any Emergency situation our customers is in a panic to stop the flow of raw sewage as quickly as possible. [...]

3 02, 2016

Double 20″ Line Stops on PCCP – Biloxi, MS

By |2018-02-03T13:30:55-04:00February 3rd, 2016|Line Stop, Projects|0 Comments

Rangeline was call recently to perform a Double 20" Line Stop on pre-stressed concrete cylinder pipe "PCCP". These Line Stop were needed to replace a isolation valve in the City's system without interruption. Rangeline has over 20 years of experience Wet Tapping & Line Stopping PCCP pipe.  Rangeline's skilled technician's have countless hours of [...]

3 02, 2016

Double 14″ Line Stops – Biloxi, MS

By |2018-02-03T13:30:55-04:00February 3rd, 2016|Line Stop|0 Comments

Recently Rangeline was called to relocated a pair of 14" PVC force mains.  First, Rangeline performed 14" By-Pas Wet Taps and the by-pass piping then was installed.  Then Rangeline installed four 14" Line Stoppers to isolate the 14" PVC piping. The Line Stoppers worked perfectly and the project was completed without a hitch.  When [...]

3 02, 2016

Quadruple 30″ Line Stops – Miami, FL

By |2018-02-03T13:30:55-04:00February 3rd, 2016|Line Stop|0 Comments

You have heard the expression "That two is always better then one"?  Well then four is even better! Recently Rangeline was called to perform a Quadruple 30" Line Stops that's right four Line Stoppers all in the pipe at the same time. Rangeline had completed quadruple Line Stops before stopping smaller pipe but 30" [...]

3 02, 2016

Double 48″ Water Main Line Stop

By |2018-02-03T13:30:56-04:00February 3rd, 2016|Line Stop|0 Comments

Water Main Line Stop Project - City of Savannah, GA When the City of Savannah, GA needs to relocate their largest transmission they call Rangeline Tapping Services to perform this critical municipal water main line stop relocation! Recently the City of Savannah, GA needed to relocate their 48" steel transmission water main. This was the [...]

29 04, 2014

Rangeline Performs Critical Wet Tap For Tampa Bay Water

By |2018-02-03T13:30:56-04:00April 29th, 2014|Line Stop, press|Comments Off on Rangeline Performs Critical Wet Tap For Tampa Bay Water

Eldridge-Wilde H22 Treatment Facility Utilizes Wet Tap for Stormwater Pollution Prevention Upgrade. West Palm Beach, FL, USA - April 29th, 2014 Rangeline Tapping Services recently completed a vital wet tap for Tampa Bay Water. The company wanted to upgrade the Eldridge-Wilde H22 Treatment Facility with their new Stormwater Pollution Prevention Plan and reached out to [...]

13 04, 2014

Rangeline Upgrades Sea World & Aquatic Park Systems With Single 36” Line Stop Service

By |2018-02-03T13:30:56-04:00April 13th, 2014|Line Stop, press|Comments Off on Rangeline Upgrades Sea World & Aquatic Park Systems With Single 36” Line Stop Service

During its upgrade of both Sea World & Aquatic theme parks, Rangeline successfully executed a full line stop enabling both parks to remain operational. West Palm Beach, FL, USA - March 13th, 2014 Rangeline and its professional team successfully executes a full 36” Line Stop service during its upgrade of both Sea World & Aquatic [...]