Double 24″ Line Stop on PCCP

1-resized

San Antonio, Texas

The pipe was a 24″ Pre-Stressed Concrete Cylinder Pipe “PCCP”.  This 24″ Raw Water main had to be relocated without shut down.  Rangeline performed a Double 24″ Line Stop with a temporary by-pass through the Line Stoppers to keep the piping system up and running while the existing pipe could be relocated.  The Line Stoppers performed flawlessly and project was completed ahead of schedule and at budget

2-resized

3-resized

4-resized

5-resized

7-resized

7aa-resized

7b-resized

8-resized

10-resized