Home Page

  Line Stopping

  Wet Tapping

  Valve Inserting

  Pipe Cutting

  Mech. Services

  About Us

  Photo Gallery
           

PCCP Tapping Sleeve Install Procedure

Body of sleeve installed and grouted with technician beginning to chip away the outer layer of concrete.

Pre-stressed wire bands removed, revealing smooth steel liner.

Connecting tapping nozzle to body of sleeve creating seal on steel liner.

Making tap to install toggle. Note toggle is used to aid in coupon retrieval.

Toggle Installed

Confirming pressure inside the main via toggle tap.

Upon completion of toggling, tapping valve is installed.

Installation complete & pressure tested.

Make Tap.

Tap completed with toggles & pilot bit retaining broken coupon.

Concrete coupon.

Steel Liner.
Home Page   •   Line Stopping   •   Wet Tapping   •   Valve Inserting   •   Pipe Cutting   •   Mech. Services   •   About Us   •   Photo Gallery

Rangeline Tapping Services, Inc.   •   PO Box 210155   •   Royal Palm Beach, FL. 33421   •   Phone: 800-346-5971   •   Fax: 561-798-2113